Calendar: Time Duration

Now we have a date range in the Calendar. Fine, but why is it still not possible to set a time duration? What sense makes a date in the (Google)Calendar without duration? If the date is p.e. 2 hours I must see that information in my Calendar for my planning.

1 Like

Just set the start date and end date to be the same day.

For example:

2 Likes

HI @Erica thanks for your response however I think OP wants to see the duration in time not the actual time for example what you suggested gives the following result :
image

OP and I would like Dynalist to calculate the duration in minutes or hours like so :

image

2 Likes

I would also like this feature, being able to specify a format where the duration is displayed instead of the end time.

1 Like