Now we have a date range in the Calendar. Fine, but why is it still not possible to set a time duration? What sense makes a date in the (Google)Calendar without duration? If the date is p.e. 2 hours I must see that information in my Calendar for my planning.
1 Like
HI @Erica thanks for your response however I think OP wants to see the duration in time not the actual time for example what you suggested gives the following result :
OP and I would like Dynalist to calculate the duration in minutes or hours like so :
2 Likes
I would also like this feature, being able to specify a format where the duration is displayed instead of the end time.
1 Like